Menu

Trade contractor · Georgia, USA

133,462,750 SF in 24 months.

Two years, 2,433 projects, and 133,462,750 square feet quantified: this commercial trade contractor runs one of the largest sustained estimating workloads Tribuild supports, plus 4,310 hours of shop drawing production, on fully outsourced preconstruction capacity.

66,652,917 SFQuantified in the trailing 12 months
4,310 hrsShop drawing production to date
Month 1 · 5,636,191 SFPeak · 9,573,293 SF

79 → 150 projects per month, +90% at peak

The volume

133,462,750 SF

of commercial construction quantified across 24 months of continuous estimating support.

5,554,410SF quantified / month, trailing 12
1,181Projects in the trailing 12 months

More square footage quantified every month than many contractors bid in a year.

Scope of work

More than estimating: full preconstruction support.

Estimating and quantity takeoffs2,433 projects
Square footage quantified133,462,750 SF
Shop drawing production4,310 hours

428 hrs

of shop drawing production delivered in a single month, the output of nearly three full-time drafters.

The economics

Department-scale output without the department.

Matching roughly 100 large projects and 5.5 million SF a month in-house would require an estimated four to five full-time U.S. estimators plus one to two drafters at current market salaries with employer burden.

$527K-$722KEstimated annual in-house staffing cost avoided
5-7Full-time preconstruction hires avoided

$12.78M

in potential annual awarded revenue from the 71 additional bids per month the added estimating capacity unlocked.

Illustrative model based on a 10% win rate and a $150,000 average awarded contract. Staffing costs modeled on U.S. estimator and drafter salaries with employer burden.

Then vs. now

Scale, without building the department first.

79 projects/mo150 projects/mo
5,636,191 SF/mo9,573,293 SF/mo
TakeoffsTakeoffs + 4,310 hrs of shop drawings

Takeoffs, estimates, and shop drawings at nine-figure square footage: preconstruction capacity that holds at scale, month after month.

Services used in this engagement

Volume like this needs capacity like this.

Quantify more, bid more, and keep preconstruction off the critical path.

Start with one free trial project